MULTIFAMILY SURFACE PROGRAM

One countertop standard. Every unit coordinated.

Sondos Stone fabricates and installs apartment kitchen countertops, bathroom vanity tops, clubhouse surfaces and multifamily countertop packages for renovation and new-construction projects throughout Greensboro and the North Carolina Triad.

PROJECT TYPES Renovation · Turnover · New Construction
UNIT SCOPE Kitchens · Vanities · Amenities
PROPERTY PORTFOLIO COUNTERTOP PACKAGE OVERVIEW
PROJECT STUDY
TOTAL UNITS 128

Four buildings · mixed unit types

72% PACKAGE COORDINATED
UNIT TYPES 4

Studio through premium two-bedroom

INSTALL PHASES 6

Sequenced by building and floor

PROPERTY PHASING BUILDING STATUS
BLDG A
Complete
BLDG B
Fabrication
BLDG C
Template
BLDG D
Pending
STANDARD PACKAGE
Warm white quartz

Kitchen, bath and clubhouse coordination

UNIT MATRIX MATERIAL STANDARD PHASED DELIVERY

Multifamily countertop work depends on repetition without losing control.

The material may repeat across dozens of units, but field conditions, cabinet layouts, plumbing locations, access, schedules and unit readiness can change from apartment to apartment.

A successful countertop package starts with a clear unit matrix, approved material standard, defined responsibilities, accurate quantities and a phased field schedule.

Sondos Stone works with property owners, developers, general contractors, renovation firms and property managers on qualifying multifamily projects.

UNIT PACKAGE MATRIX

Standardize the countertop package by floor plan.

UNIT TYPE S1 STUDIO PACKAGE
LIVING / SLEEPING
KITCHEN
BATH
ENTRY
COUNTERTOP SCOPE
PACKAGE 01

Compact kitchen and vanity package.

Studio units benefit from a tightly standardized countertop package with minimal pieces, controlled sink locations and repeatable cabinet dimensions.

Kitchen
Single-wall or compact L-shaped layout
Bathroom
Single vanity top with one sink opening
Priority
Fast repetition and controlled material usage
UNIT TYPE A1 ONE-BEDROOM PACKAGE
LIVING
BEDROOM
KITCHEN
BATH
COUNTERTOP SCOPE
PACKAGE 02

Standard apartment kitchen with one bath.

One-bedroom units commonly use repeatable L-shaped kitchens, apartment-size appliances and a consistent single-vanity bathroom package.

Kitchen
L-shaped or galley countertop configuration
Bathroom
Standard single-bowl vanity
Priority
Consistent seams, sink locations and backsplash scope
UNIT TYPE B2 TWO-BEDROOM PACKAGE
LIVING
BED 01
BED 02
KITCHEN
BATH 01
BATH 02
COUNTERTOP SCOPE
PACKAGE 03

Larger kitchen with multiple vanity surfaces.

Two-bedroom units may include longer kitchen runs, peninsula seating, two bathrooms or upgraded primary-bedroom vanity configurations.

Kitchen
Larger L-shape, U-shape or peninsula layout
Bathrooms
One or two vanity-top configurations
Priority
Accurate unit counts and room-specific labeling
UNIT TYPE P2 PREMIUM PACKAGE
OPEN LIVING
ISLAND KITCHEN
PRIMARY BATH
POWDER
COUNTERTOP SCOPE
PACKAGE 04

Upgraded surfaces for premium or penthouse units.

Premium units may require islands, waterfall ends, larger vanity tops, thicker visual edges or a separate material package from standard apartments.

Kitchen
Island, peninsula or expanded open-concept layout
Bathrooms
Double vanities and upgraded edge conditions
Priority
Separate material, layout and approval tracking

APARTMENT TURNOVER WORKFLOW

Move each unit from vacancy to leasing-ready.

01

Move-out

Unit becomes vacant and the renovation scope is documented.

02

Demo and repair

Existing tops are removed and cabinets or walls are corrected.

03

Field measure

Installation-ready cabinetry and field conditions are measured.

04

Fabrication

Approved pieces are cut, finished, labeled and prepared.

05

Installation

Countertops are delivered and installed by scheduled unit group.

06

Leasing ready

Final trades complete connections, cleaning and turnover closeout.

PROPERTY STANDARDIZATION

Reduce decisions without ignoring real field conditions.

A controlled countertop standard makes future turns, repairs and phased renovations easier. The package should still account for different unit types, cabinet changes, appliance sizes and legacy field conditions.

  • Approve a primary countertop color
  • Choose a backup or alternate material
  • Standardize sink models by unit type
  • Define edge and backsplash requirements
  • Create a unit-number labeling system
PROPERTY FINISH STANDARD REVISION 01
PRIMARY MATERIAL Warm White Quartz

Consistent visual package across kitchens and bathrooms.

EDGE Eased
THICKNESS Project specified
KITCHEN SINK Single bowl
VANITY SINK Oval undermount
BACKSPLASH Project defined
ALT. MATERIAL Pre-approved backup
FIELD EXCEPTION

Units with altered cabinets, damaged substrates, unusual walls or nonstandard appliances should be flagged before template.

PROJECT DELIVERY MODEL

New construction and occupied renovation require different plans.

01 NEW CONSTRUCTION

Coordinate unit types before repetitive installation begins.

New multifamily construction benefits from approved prototypes, clear unit matrices, consistent cabinetry and planned floor-by-floor installation.

  • Prototype or model-unit approval
  • Unit-type quantity matrix
  • Floor and building delivery schedule
  • Approved sink and appliance packages
  • Loading and material-staging plan
02 RENOVATION & TURNOVER

Control access and downtime across occupied properties.

Renovation work may happen by vacant unit, building phase or scheduled resident relocation. Every phase needs reliable unit readiness and communication.

  • Vacant-unit release schedule
  • Existing-condition review
  • Cabinet repair responsibility
  • Resident and access coordination
  • Phased demolition and installation
PHASED TURNOVER

MULTIFAMILY COUNTERTOP AREAS

One property can include more than apartment kitchens.

01

Apartment kitchens

Repeated unit kitchens may include straight runs, L-shapes, peninsulas, islands, sink cutouts and small appliance openings.

STUDIO ONE BEDROOM TWO BEDROOM PREMIUM
02

Bathroom vanities

Single and double vanity tops for primary, secondary and powder bathrooms.

03

Clubhouse kitchens

Amenity kitchens, event counters and resident gathering spaces.

04

Leasing offices

Reception desks, refreshment counters and staff work surfaces.

05

Fitness amenities

Water stations, refreshment counters and selected vanity surfaces.

06

Outdoor amenity areas

Pool-house, grilling and pavilion counters using appropriate exterior materials.

MULTIFAMILY MATERIAL STRATEGY

Balance appearance, consistency, availability and replacement.

The ideal property standard should be visually appropriate, available in repeat quantities and realistic to replace during future unit turns.

PORTFOLIO PLANNING

Large projects should confirm material availability, production lots, alternates and replacement strategy before approving a long-term property standard.

PHASED INSTALLATION CONTROL

Release units only when they are ready for countertop work.

INSTALLATION PHASES BUILDING B
UNITS RELEASED 18
TEMPLATE READY 15
FIELD EXCEPTIONS 3
Unit Type Cabinets Template Install Status
201 A1 Ready Complete Scheduled Ready
202 B2 Ready Complete Scheduled Ready
203 S1 Repair Hold Pending Exception
204 A1 Ready Complete Scheduled Ready
205 P2 Ready Review Pending Review

REQUEST MULTIFAMILY PRICING

Send quantities, unit types and schedule together.

01

Unit matrix

Unit numbers, types, buildings, floors and countertop quantities.

02

Architectural plans

Floor plans, elevations and amenity-space drawings.

03

Cabinet layouts

Kitchen and vanity plans for every approved unit type.

04

Material specification

Brand, color, finish, thickness and approved alternates.

05

Sink schedule

Kitchen and vanity sink models by unit package.

06

Phase schedule

Building release, template and installation sequence.

07

Site logistics

Loading, elevators, staging, parking and access restrictions.

08

Project contacts

Estimator, project manager, superintendent and property contact.

MULTIFAMILY COUNTERTOPS ACROSS THE NC TRIAD

Fabricated in Jamestown for apartment and property projects across central North Carolina.

GREENSBORO Apartment renovation and new construction

Unit kitchens, vanities, leasing offices and amenity areas.

HIGH POINT Multifamily and property-management projects

Turnover programs, phased renovations and replacement tops.

WINSTON-SALEM Apartment and community countertop packages

Unit standards, clubhouses and leasing-center surfaces.

JAMESTOWN Local fabrication and project coordination

Shop production, material planning and phased installation.

KERNERSVILLE BURLINGTON ASHEBORO LEXINGTON THOMASVILLE ARCHDALE TRINITY SUMMERFIELD OAK RIDGE CLEMMONS

Project availability depends on unit count, drawings, specifications, material availability, schedule, field readiness and installation access.

View Complete Service Area

MULTIFAMILY COUNTERTOP QUESTIONS

Before the first unit enters production.

Does Sondos Stone handle apartment countertop projects? +

Yes. Sondos Stone reviews qualifying multifamily renovation, apartment turnover and new-construction countertop projects across Greensboro and the North Carolina Triad.

Can you price multiple apartment unit types? +

Yes. A unit matrix, cabinet plans, countertop quantities, sink schedule, material specification and phase schedule help establish pricing by unit type.

Can one countertop color be standardized across a property? +

Yes. The project should confirm material availability, approved alternates, replacement strategy, sink packages, edges and backsplash requirements before adopting a property-wide standard.

Can you replace countertops during apartment turnovers? +

Qualifying turnover programs may be reviewed based on unit volume, cabinet readiness, demolition responsibility, access, scheduling and material standardization.

Does Sondos Stone remove the existing apartment countertops? +

Removal responsibility should be defined in the project scope. Cabinets, plumbing, appliances, walls and substrates must be ready for final measurement and installation.

Can you install countertops building by building? +

Yes. Multifamily installation may be phased by building, floor, unit group or renovation release schedule when the project sequence is confirmed in advance.

Can you fabricate clubhouse and leasing-office countertops? +

Yes. Qualifying projects may include apartment kitchens, vanities, clubhouse kitchens, leasing-office counters, reception desks and amenity surfaces.

Where does Sondos Stone complete multifamily projects? +

Sondos Stone serves Greensboro, High Point, Winston-Salem, Jamestown and surrounding North Carolina Triad communities. Additional areas may be reviewed based on the project scope.

MULTIFAMILY SURFACE PACKAGE PHASED COMMERCIAL DELIVERY

Standardize the package.
Release the units.
Keep the property moving.

Send the unit matrix, plans, cabinet layouts, material specifications, sink schedule, project phases, site logistics and bid contact information.